Finish Along Quarter 3 2019 Goals!

I totally missed the Finish Along for Quarter 2! Which was fine, because I didn’t get much done anyway!  So here we are at Quarter 3… Um, where has this year gone???

I don’t know how much I’ll actually get done this quarter with summer vacation and way too busy at work… But I’m going to try to get some of these done! I really need ot get antoher one of my Do Good Stitches quilts. I have two left that need to go to the group. I’m thinking the lollipop one may be first!

This one has been hanging on the design wall for way to long! So I’d really like to get these blocks pieced and done!

And this one! It’s been on the list for too long!

The thing about all these WIP’s is that all the blocks are done for each one! So they shouldn’t take long, right???

I also want to finish my Halloween quilt before Halloween! I don’t have all the blocks done, but I think I have almost half of them…

That’s my list! What’s on yours? Be sure to join in!